MIME-Version: 1.0 Content-Type: multipart/related; boundary="----=_NextPart_01C868D1.A555DB20" This document is a Single File Web Page, also known as a Web Archive file. If you are seeing this message, your browser or editor doesn't support Web Archive files. Please download a browser that supports Web Archive, such as Windows® Internet Explorer®. ------=_NextPart_01C868D1.A555DB20 Content-Location: file:///C:/A34A4637/033007.htm Content-Transfer-Encoding: quoted-printable Content-Type: text/html; charset="us-ascii"
<=
span
style=3D'mso-tab-count:1'> &=
nbsp; &nbs=
p; &=
nbsp; &nbs=
p; &=
nbsp; &nbs=
p; &=
nbsp; &nbs=
p;
=
Magellan Petroleum
Announces
Weekly Drilling Report
Kamel-1 & Thungo-11
Nockatunga Oil Fields –
The Kamel-1 exploration well in PL =
51 in
the
The Thungo-11 a= ppraisal well spudded in PL 51 on March 26. Thungo-= 11 is the last well in the current 10-well drilling program at the Nockatunga area.&nbs= p; The drilling program has been part of the Santos Cooper Oil Program.= At 06:00 hours on March 28 we are preparing to drill out of surface casing.
Kamel-1 Details:
Petroleum Title: &=
nbsp; PL
51,
Location: &nb=
sp; =
Approximately
1.7 km north northwest of Thungo-5
Coordinates: =
&nb=
sp; Latitude:
27 degrees 42' 16.51" South
=
&nb=
sp; Longitude:
142 degrees 34' 38.24" East (GDA 94)
JV Operator: &=
nbsp; Santos
Limited
Drilling Ri=
g: &=
nbsp; PDI
721
Total Depth: &=
nbsp; 1391
meters RT
Objectives:&nbs= p; &= nbsp; Pr= imary – Murta Member; Secondary – Birkhead Formation
Operations for period: Kamel-1 spudded on March 16, 2007 and was drilled to a total depth of 1,391 mRT. Wireline logs were run and 2 DSTs were attempted over= the Murta interval. Both DSTs were unsuccessful due to mechanical reasons. The well was cased and suspended as a future oil produc= er.
Progress f=
or
Period: =
0
meters.
Thungo-11 Details:
Petroleum Title: &=
nbsp; PL
51,
Location: &nb=
sp; =
Approximately
400 m west southwest of Thungo-6 and =
&=
nbsp; &nbs=
p; =
300
m northwest of Thungo-4
Coordinates: =
&nb=
sp; Latitude:
27 degrees 43' 45.80" South
=
&nb=
sp; Longitude:
142 degrees 34' 21.95" East (GDA 94)
JV Operator: &=
nbsp; Santos
Limited
Drilling Ri=
g: &=
nbsp; PDI
721
Proposed Total Depth: 1,269 meters RT
Objectives:&nbs= p; &= nbsp; Pr= imary – Murta Member; Secondary – Westbou= rne Formation
Operations for period: Thungo-11 spudded on March 2= 6, 2007 and was drilled to a surface casing depth of 188 mRT= span>. At 06:00 hours on March 28, we are preparing to drill out of surface casing= .
Progress f= or Period: = 188 meters.
Participants
in Kamel-1 and Thungo-11 are:
= Magellan Petroleum Corporation &nbs= p; &= nbsp; 38.994%
= Santos Limited Group (Operator) &= nbsp; &nbs= p; 61.006%
Forward Looking Statements
Statements in this release which are not historical in nature are intended to be, and are hereby identified as, forward-looking statements for purposes of the Private Securities Litigatio= n Reform Act of 1995. These statements about Magellan and MPAL may relate to their businesses and prospects, revenues, expenses, operating cash flows, and oth= er matters that involve a number of uncertainties that may cause actual result= s to differ materially from expectations. Among these risks and uncertainties ar= e the extent of the recoverable reserves at those properties and the risk that any wells drilled may fail to encounter hydrocarbons in commercially recoverable quantities. Any forward-looking information provided in this release should= be considered with these factors in mind. Magellan assumes no obligation to up= date any forward-looking statements contained in this release, whether as a resu= lt of new information, future events or otherwise.
For further information, please
contact Daniel Samela at (860) 293-2006.