MIME-Version: 1.0 Content-Type: multipart/related; boundary="----=_NextPart_01C868D1.C99507E0" This document is a Single File Web Page, also known as a Web Archive file. If you are seeing this message, your browser or editor doesn't support Web Archive files. Please download a browser that supports Web Archive, such as Windows® Internet Explorer®. ------=_NextPart_01C868D1.C99507E0 Content-Location: file:///C:/A3495637/031407.htm Content-Transfer-Encoding: quoted-printable Content-Type: text/html; charset="us-ascii"
<=
span
style=3D'mso-tab-count:1'> &=
nbsp; &nbs=
p; &=
nbsp; &nbs=
p; &=
nbsp; &nbs=
p; &=
nbsp; &nbs=
p;
=
Magellan Petroleum
Announces
Weekly Drilling Report
Muthero-6 & Burrum-2
Nockatunga Fields –
The Muthero-6 appraisal well in PL =
51
southwest
The Burrum-2 well, the second of the two coal seam=
gas
well program in ATP 613P in the Burrum Syncline. At 06:00 hrs on March 14 Burru=
m-2
was at a depth of 390 meters. Several coal seams have been intersected and
sampled for desorption analysis.
Eureka Petroleum, a wholly-owned su=
bsidiary
of Energy Investments Limited, is funding 100% of a two-staged coal seam gas
exploration program, in return for which it will be assigned a 90% working
interest in the Burrum Syncline farmin
area. Stage 1 comprises the current two-well program. Magellan has the righ=
t to
back-in to retain up to a 50% participating interest in any development by
matching
Muthero-6 Details:
Petroleum Title: &=
nbsp; PL
51,
Location: &nb=
sp; =
Approximately
270
meters east of Muthero-3
Coordinates: =
&nb=
sp; Latitude:
27 degrees 42' 46.68" South=
=
&nb=
sp; Longitude:
142 degrees 36' 55.56" East (GDA 94)
JV Operator: &=
nbsp; Santos
Limited
Drilling Ri=
g: &=
nbsp; PDI
721
Total Depth: &=
nbsp; 1446
meters RT
Objectives:&nbs= p; &= nbsp; Pr= imary – Birkhead Formation; Secondary –Murta Member
Operations for period: Muthero-6 spudded on March 4, 2007 and drilled to a total depth of 1,446 mRT.= The well is being cased and suspended as a future oil producer.
Progress f=
or
Period: =
654
meters.
Participants
in Muthero-6 are:
= Magellan Petroleum Corporation &nbs= p; &= nbsp; 38.994%
= Santos Limited Group (Operator) &= nbsp; &nbs= p; 61.006%
Burrum-2 Details:
Petroleum Title: &=
nbsp; ATP
613P
Location: &nb=
sp; =
Approximately 2 km
northeast of the township of Howard and
approximately 55 km north of =
the
city of Maryborough
Coordinates: =
&nb=
sp;
JV Operator: &=
nbsp; Magellan
Petroleum Corporation
Drilling Rig: &=
nbsp; Depco Rig 22 - UDR 1200
Proposed Total Depth: 600 meters
Objectives:&nbs= p; &= nbsp; Co= als of the Burrum Coal Measures
Operations for period: Burrum-2 spudded on March 4,
2007 and was drilled in open hole to a depth of 115 m. The well was then fully cored a=
nd at
06:00 hrs on March 14 was at a depth of 390 m=
span>.
Progress f=
or
Period: =
390
meters.
Participants
in Burrum-2 are:
= Magellan Petroleum Corporation (Operator)  = ; 10%
= Energy Investments Limited = &nb= sp; = 90%
Forward Looking Statements
Statements in this release which are not historical in nature are intended to be, and are hereby identified as, forward-looking statements for purposes of the Private Securities Litigation Reform Act of 1995. These statements about Magellan and MPAL may relate to their businesses and prospects, revenues, expenses, operating cash flows, a= nd other matters that involve a number of uncertainties that may cause actual results to differ materially from expectations. Among these risks and uncertainties are the extent of the recoverable reserves at those properties and the risk that any wells drilled may fail to encounter hydrocarbons in commercially recoverable quantities. Any forward-looking information provid= ed in this release should be considered with these factors in mind. Magellan assumes no obligation to update any forward-looking statements contained in this release, whether as a result of new information, future events or otherwise.
For further information, please
contact Daniel Samela at (860) 293-2006.