MIME-Version: 1.0 Content-Type: multipart/related; boundary="----=_NextPart_01C868D2.3CED3AA0" This document is a Single File Web Page, also known as a Web Archive file. If you are seeing this message, your browser or editor doesn't support Web Archive files. Please download a browser that supports Web Archive, such as Windows® Internet Explorer®. ------=_NextPart_01C868D2.3CED3AA0 Content-Location: file:///C:/A339CA37/022107.htm Content-Transfer-Encoding: quoted-printable Content-Type: text/html; charset="us-ascii"
<=
span
style=3D'mso-tab-count:1'> &=
nbsp; &nbs=
p; &=
nbsp; &nbs=
p; &=
nbsp; &nbs=
p; &=
nbsp; &nbs=
p;
=
Magellan Petroleum
Announces
Weekly Drilling Report
Muthero-4 & Tunkalilla-1
Nockatunga Fields –
The Muthero-4 appraisal well in PL =
51
southwest
Muthero-4 spudded on February 13 an= d was drilled to a total depth of 1,440 meters. Oil shows were recorded in the Murta Member and the upper Birkh= ead Formation. Wireline logs indicate 6 meters of n= et pay in the upper Birkhead Formation. The well is be= ing cased and suspended. The rig will now move to the Muthero-5 appraisal well location approximately 250 meters southwest of Muthero-4.
The Tunkalilla-1 exploration well s=
pudded
in PEL 94 in
The Telowie-1 exploration well is l=
ocated
on the southern flank of the
Muthero-4 Details:
Petroleum Title: &=
nbsp; PL
51,
Location: &nb=
sp; =
Approximately
240
meters SE of Muthero 3
Coordinates: =
&nb=
sp; Latitude:
27 degrees 42' 46.64" South
=
&nb=
sp; Longitude:
142 degrees 36' 54.43" East (GDA 94)
JV Operator: &=
nbsp; Santos
Limited
Drilling Rig: &=
nbsp; PDI
721
Total Depth: &=
nbsp; 1,440
meters RT
Objectives:&nbs= p; &= nbsp; Pr= imary – Murta Member
&nb= sp; = &nb= sp; = Secondary – Birkhead Formation
Operations for period: The well was drilled in 10-5= /8" hole to 219 m and 8-5/8"surface casing was set. The well was= then drilled in 7-7/8" hole to a total depth of 1,440 m. Wireline logs= were run and the well is being cased and suspended.
Progress f=
or
Period: =
925
meters.
Participants
in Muthero-4 are:
= Magellan Petroleum Corporation &nbs= p; &= nbsp; 38.994%
= Santos Limited Group (Operator) &= nbsp; &nbs= p; 61.006%
Tunkalilla-1 Details:
Petroleum Title: &=
nbsp; PEL
94
Location: &nb=
sp; =
Approximately 3.5 km=
north
of Maslins-1
Coordinates: =
&nb=
sp; Latitude:
28 degrees 50' 55.41" South
=
&nb=
sp; Longitude:
140 degrees 01' 17.54" East (GDA 94)
JV Operator: &=
nbsp; Beach
Petroleum Ltd
Drilling Rig: &=
nbsp; Century
Rig 3
Total Depth: &=
nbsp; 1,422
meters RT
Objectives:&nbs=
p; &=
nbsp; Pr=
imary
–
&nb= sp; = &nb= sp; = Secondary – Murta member
Operations for period: The well spudded on February=
13,
2007 and was drilled in 12-1/4" hole to the surface casing depth of 651 m. The well was then drilled in 7⅝" hole to a total depth of 1,422 metres. No hydrocarbon sh=
ows were
encountered in the Namur Sandstone or the Murta Member targets=
Progress f=
or
Period: =
1,196
meters.
Telowie-1 Details:
Petroleum Title: &=
nbsp; PEL
94
Location: &nb=
sp; =
Approximately 4.8 km
northeast of Maslins-1
Coordinates: =
&nb=
sp; Latitude:
28 degrees 51' 47.31" South
=
&nb=
sp; Longitude:
140 degrees 03' 36.76" East (GDA 94)
JV Operator: &=
nbsp; Beach
Petroleum Ltd
Drilling Rig: &=
nbsp; Century
Rig 3
Proposed Total Depth: 1,367 meters RT
Objectives:&nbs=
p; &=
nbsp; Pr=
imary
–
&nb= sp; = &nb= sp; = Secondary – Murta member
Participants
in Tunkalilla-1 and Telowie-1 are:
= Magellan Petroleum Corporation &nbs= p; &= nbsp; 35%
= Beach Petroleum Ltd (Operator) &= nbsp; &nbs= p; 50%= span>
= Victoria Petroleum NL &= nbsp; &nbs= p; &= nbsp; 15= %
Forward Looking Statements
Statements in this release which are not historical in nature are intended to be, and are hereby identified as, forward-looking statements for purposes of the Private Securities Litigation Reform Act of 1995. These statements about Magellan and MPAL may relate to their businesses and prospects, revenues, expenses, operating cash flows, a= nd other matters that involve a number of uncertainties that may cause actual results to differ materially from expectations. Among these risks and uncertainties are the extent of the recoverable reserves at those properties and the risk that any wells drilled may fail to encounter hydrocarbons in commercially recoverable quantities. Any forward-looking information provid= ed in this release should be considered with these factors in mind. Magellan assumes no obligation to update any forward-looking statements contained in this release, whether as a result of new information, future events or otherwise.
For further information, please
contact Daniel Samela at (860) 293-2006.